New Strategies for Deep-Underground Mining: The Critical Role of Shaft Extension Technology and Key Implementation Considerations — Heijingang Report
In mining engineering, shafts are indispensable critical infrastructure for the extraction of mineral resources.
From the perspective of resource extraction, shaft extension is a crucial key to unlocking deep‑lying mineral resources. As shallow‑level reserves become increasingly depleted, venturing deeper underground has become an inevitable trend. By extending existing shafts, we can access lower‑grade ore bodies, expand the mine’s operational footprint, and increase recoverable reserves, thereby significantly prolonging the mine’s service life. This not only delivers sustained economic benefits to enterprises but also provides a robust safeguard for national resource security. For instance, in certain metallic mines, shaft extensions have enabled the successful extraction of substantial quantities of high‑quality ore from deep deposits, extending the mine’s productive lifespan by several decades and injecting continuous momentum into local economic development.
From the perspective of improving production efficiency, extending the vertical shaft can optimize the overall layout and workflow of mining operations. Before the shaft is extended, limited mining depth often necessitates the use of complex inclined shafts or other auxiliary access tunnels, which not only increase transportation costs and time but also reduce operational efficiency. By contrast, once the shaft is extended, ore can be transported to the surface more directly and efficiently, significantly shortening transport distances and times while enhancing hoisting capacity. At the same time, the new shaft can be equipped with state-of-the-art equipment and technologies, further advancing the automation and intelligence of mining processes, reducing labor requirements, and lowering physical workload—thereby comprehensively boosting production efficiency.
In addition, shaft extension is of great significance for both mine safety and environmental protection. A well‑designed extension can enhance underground ventilation, reduce the concentration of harmful gases, and create a safer working environment for miners. At the same time, an extended shaft facilitates the centralized treatment and discharge of wastewater and waste rock, thereby minimizing environmental pollution and supporting the sustainable development of the mine.
This paper aims to conduct an in-depth analysis of shaft extension schemes, comprehensively examining the advantages and disadvantages, applicable conditions, and key construction techniques and precautions, thereby providing a scientific, comprehensive, and practical reference for mining engineering.
PART 01 Basic Understanding of Shaft Extension
1.1 Definitions and Connotations
Shaft extension, in essence, is a complex and critical engineering operation that builds upon an existing shaft by systematically and purposefully extending the shaft deeper underground through a suite of specialized technical methods. This process is far from a mere increase in depth; it entails the integrated application of multidisciplinary knowledge, diverse technological processes, and a wide array of specialized equipment. In the field of mining engineering, the shaft serves as a vital transportation artery linking the surface to underground mineral resources, acting as the “lifeline” of the entire mining operation. The implementation of a shaft‑extension project is akin to injecting new vitality into this lifeline, enabling it to penetrate deeper into ore bodies and thereby creating the necessary conditions for subsequent mining activities.
From a technical standpoint, shaft extension requires precise surveying to determine the direction and depth of the extension, ensuring that the shaft’s verticality and cross-sectional dimensions meet design specifications. At the same time, depending on the specific geological conditions, appropriate construction methods and support techniques must be selected to guarantee safety and stability throughout the construction process. For instance, in areas with hard rock and stable geological conditions, conventional blast‑driving can be employed; whereas in regions with complex geology—such as those containing faults, fractured zones, or significant water inflows—specialized construction techniques, including freezing and grouting, are necessary to reinforce the ground and prevent collapses and water‑inrush incidents.
From an engineering management perspective, the shaft‑extension project involves numerous stakeholders, including design firms, construction contractors, and supervisory agencies. Close collaboration among all parties is essential to jointly develop a detailed construction schedule and comprehensive safety‑assurance measures. During execution, it is imperative to rigorously manage schedule, quality, and costs to ensure that the project is completed on time, to the required standards, and within the specified scope.
PART 02 In-Depth Analysis of the Shaft Extension Plan
2.1 Bottom-up excavation of small cross-sections, followed by lining of the main shaft.
2.1.1 Using a reverse shaft to extend downward from the bottom upward
Using a reverse shaft to extend a vertical shaft from the bottom up is a widely adopted method in metal mines. Its construction process is relatively complex, involving several critical steps. Near the shaft to be extended, the first step is to excavate a pilot shaft down to a new level. This pilot shaft is essential, serving as the foundational access passage for subsequent operations. To minimize temporary works, the permanent structure should be utilized as the pilot shaft whenever possible. For example, in mines developed with a central pair of shafts, one shaft can initially be extended downward from the top to serve as the pilot shaft, after which the other shaft can be extended upward from the bottom using this pilot shaft as a guide. In metal mines, if a hoisting shaft is located near the central shaft, that hoisting shaft can also be extended downward first and equipped with construction‑grade hoisting machinery, thereby functioning as the pilot shaft for extending a combined shaft. As demonstrated in the Hebei Copper Mine during the extension of its combined shaft, the hoisting shaft—situated 12 meters away from the main shaft—was ingeniously employed as the pilot shaft.
Once the pilot shaft reaches the new level, a connecting drift shall be driven from it to the lower section of the deepened shaft, followed by the excavation of another connecting drift, while leaving protective rock pillars to ensure proper preparatory work for the deepening operation. Subsequently, within the shaft’s footprint, small‑diameter reverse shafts are excavated from bottom to top. These reverse shafts play a critical role, as they link the upper and lower connecting drifts, thereby providing favorable conditions for ventilation, personnel access, and material supply. Various methods are employed for reverse shaft excavation, including the suspended cage method, the climbing cage method, the deep‑hole blasting method, the drilling method, and the conventional method. Each approach has its own advantages and disadvantages, and the appropriate technique should be selected based on specific geological conditions, engineering requirements, and other relevant factors.
Wellbore enlargement is a critical step in this scheme, and depending on the direction of the enlargement, it can be categorized into two approaches: bottom-up and top-down. The bottom-up method bears considerable resemblance to the shallow‑hole shrinkage mining technique: after the reverse shaft has been excavated, the floor is lowered from the bottom of the shaft, leaving a bottom pillar to create the necessary space for further excavation; a funnel is then installed. Vertical holes are drilled upward, and part of the blasted rock is discharged through the funnel, loaded into mine cars, and hoisted to the production level via a temporary cage. The remaining rock is temporarily left in the shaft, which facilitates drilling and blasting operations on the muck surface while leveraging the retained waste rock to stabilize the shaft walls. Personnel, materials, and equipment are raised and lowered using buckets. Once the entire wellbore has been enlarged to the auxiliary level, the rock inside is gradually removed while the permanent shaft lining is constructed. This method offers several advantages, including the elimination of temporary support, convenient downward discharge of waste rock, and the use of upward‑drilling rigs that enable faster, more labor‑efficient drilling. However, it also has certain drawbacks: workers operate beneath the roof, and when the rock is not particularly strong or intact, safety risks are elevated; after each blast, the working face must be leveled, which is time‑consuming and labor‑intensive; a temporary bottom pillar must be established prior to wellbore enlargement; and drilling cannot be carried out concurrently with mucking and loading.
When enlarging the shaft from top to bottom, the initial enlargement begins by excavating 4–5 meters of the shaft downward from the auxiliary level, installing a sealing platform, and then continuing to enlarge the shaft further. During the enlargement process, the rock blasted out is conveyed down the reverse shaft to the new level and loaded onto trucks using a rock‑loading machine for removal. Because the enlarged shaft walls expose a large surface area, temporary support—such as rock bolts, shotcrete, or ring‑and‑backboard systems—is required to ensure stability. To prevent workers and tools from falling into the reverse shaft during the enlargement operation, a safety grating should be installed at the mouth of the reverse shaft; it is lifted prior to blasting and replaced after blasting. The enlargement of the shaft and the lining works are typically carried out using a short‑section excavation‑lining sequence, with lining and enlargement alternating. This method offers the advantage of enabling simultaneous drilling for shaft enlargement and rock‑loading operations in the lower section of the shaft, thereby accelerating construction progress and shortening the overall project schedule.
Once the equipment installation in the deepening shaft is complete and the excavation and lining at the junction between the shaft and the underground level have been finished, it becomes necessary to remove the protective rock pillar (or the artificial protective platform) to establish through‑connection of the shaft. This is a task that carries certain risks; prior to removal, all production hoisting operations within the shaft must be halted to ensure the safety of the miners. Preparatory work for dismantling the rock pillar includes draining accumulated water and sludge from the bottom sump—this can be accomplished using small buckets or mine cars from the production level, or by drilling drainage holes downward through the pillar to discharge water and mud. A temporary protective platform should be erected 1–1.5 meters below the production level, and a sealing platform installed at the auxiliary deepening level. Additionally, the head sheave support beams and other facilities in the hoisting cageway beneath the rock pillar must be removed. There are two primary methods for removing the rock pillar: the conventional method and the deep‑hole blasting method. The conventional approach involves utilizing the existing access passages during shaft deepening—either via the deepening chamber or the ladderway—to carry out upward‑downward brushing and lining. When employing alternative deepening techniques to excavate the full cross‑section of the rock pillar, one first drills pilot holes or creates small reverse shafts no larger than 4 m², which are then connected to the main shaft from below, after which the shaft is lined upward from the top according to its design profile. In contrast, the deep‑hole blasting method begins by drilling holes through the rock pillar to determine its actual thickness, draining any accumulated water at the shaft bottom, and excavating a small‑cross‑section vertical shaft within the pillar to create a blast‑compensation space. Subsequently, deep holes are drilled from the bottom up across the entire cross‑section of the shaft, and following detonation, the resulting debris is loaded and transported away via the auxiliary deepening level. This method eliminates heavy manual labor, obviates the need for prior bottom‑drainage, and minimizes the duration of production shutdowns within the shaft; moreover, during most of the time spent drilling the deep holes and loading the rock, normal production can continue, and the rock‑breaking rate achieved by deep‑hole blasting is relatively rapid.
Using a reverse shaft to extend the shaft from the bottom upward offers numerous advantages: waste rock and muck slide down under gravity, eliminating the time‑consuming and labor‑intensive tasks of loading and hoisting that are typical in conventional shaft extensions. Throughout the entire extension process, dewatering is unnecessary, and standard equipment can be used to achieve a high advance rate at low cost. However, this approach also has drawbacks: preparation takes considerable time, as it requires first excavating a pilot shaft and a connecting drift leading to the lower section of the extension shaft; moreover, if the pilot shaft has a small cross‑section and manual loading with small buckets is employed for hoisting, the excavation rate is often constrained.
2.1.2 Bottom-up multi-segment deepening
Downward, multi‑section deepening is primarily employed in metal mines, especially in small and medium‑sized nonferrous metal mines. These mines typically adopt a multi‑section mining approach, with several sections integrated into a centralized hoisting and ore‑discharge system. Consequently, each time the shaft is deepened, several sections must be advanced simultaneously to prepare for a new ore‑discharge system. For example, at the Hongtoushan Copper Mine and the Hebei Copper Mine, mixed shafts are deepened by three sections at once, totaling 180 meters. Under such circumstances, if each section were deepened sequentially using conventional construction methods, the project duration would inevitably be prolonged. To accelerate shaft‑deepening progress, where conditions permit, parallel operations involving multiple sections should be organized. This type of parallel work comprises two key components: first, simultaneous underground excavation and the development of connecting drifts among the sections; second, adopting reverse‑excavation techniques to enable parallel advancement across multiple sections during shaft deepening.
The key to conducting parallel operations of advance underground excavation and connecting‑passage driving lies in resolving the issue of simultaneous mucking from both working faces. Taking the third‑system deepening at Hongtoushan Copper Mine as an example, a two‑stage hoisting system is employed during the advance underground excavation: one stage uses skip buckets to lift rock from the advancing section to the level of the preceding connecting passage, where it is discharged into mine cars via chutes; the second stage utilizes a temporary cage installed within the advance shaft to convey the material to the same level for removal. To facilitate this process, the cross‑section of the advance shaft is divided into two compartments: one accommodates a 0.5 m³ skip bucket for hoisting, while the other houses a double‑deck temporary cage capable of carrying fixed mine cars with a capacity of 0.7 m³ each. Concurrently with the excavation of the blind auxiliary shaft, a connecting passage leading to the bottom of the deepening shaft is driven at the intermediate level; the excavated rock is loaded into mine cars and directly lifted to the upper level by the temporary cage, thereby ensuring that the excavation of the blind auxiliary shaft and the connecting passage can proceed in tandem.
The procedure for reverse excavation of a vertical shaft with multiple intermediate levels operating in parallel is as follows: first, drill the central pilot hole for the hoisting cage; then, advance the reverse shaft using the hoisting‑cage method; next, enlarge the shaft by reaming; and finally, line the enlarged shaft with masonry or other lining materials. In essence, simultaneously deepening the shaft across several levels involves carrying out, at each level and from bottom to top, one stage of the deepening process according to the sequence described above, thereby enabling parallel operations at all levels and shortening the overall construction schedule. Taking the second system of the mixed shaft at Hongtoushan Copper Mine as an example, this shaft has a clear diameter of 5.5 m; prior to deepening, its depth was 220 m, and a single deepening operation required advancing four intermediate levels totaling 217 m. The shaft passes through biotite gneiss, a dense, stable rock formation with no water inflow. By utilizing a neighboring ore‑drift as a pilot drift for underground excavation, and concurrently driving the connecting drifts between the intermediate levels, once the base of the mixed shaft is reached, reverse excavation can be organized with multiple levels proceeding in parallel. Specifically, in the first intermediate level, muck is concentrated and the shaft lining is sprayed with concrete; in the second level, the shaft is enlarged from the bottom up; in the third level, raiseways are excavated using the hoisting‑cage method; and in the fourth level, the central pilot hole for the hoisting cage is drilled.
During each section of the shaft, when preparing for reverse excavation and widening the reverse‑shaft opening, it is essential to carefully consider the construction progress of the adjacent upper and lower levels and ensure smooth coordination and sequencing of operations. Taking the second intermediate level as an example, a 2 m × 2 m cross‑section adit is first driven at the shaft center using the hoisting cage method. Once this adit is connected to the first intermediate level, bottoming out of the shaft is carried out 2.5–3.0 m above the roof of the lower horizontal drift on the second intermediate level, leaving a temporary bottom pillar before expanding the space required for reverse shaft excavation. A funnel is installed at the lower end of the adit to facilitate slag discharge, loading, and removal. To prevent the funnel from being damaged during the through‑drilling blast in the third intermediate level, prior to installing the funnel, a 2‑m‑long pilot adit is excavated at the anticipated breakthrough point, conforming to the specified dimensions. The hoisting cage access hole drilled in the third intermediate level is extended with steel pipe, projecting 200 mm above the floor elevation of the inter‑level connecting drift; the interface between the steel pipe and the surrounding rock is sealed with waterproofing measures to prevent water ingress that could impede the advancement of the third‑level adit. The pre‑excavated 2‑m‑long adit is backfilled with waste rock, which will serve as a buffer during the final breakthrough blast, helping to protect the funnel from damage.
Before the reverse excavation of the shaft, a 0.5 m³ skip hoist shall be installed in the adit to transport personnel and materials. The hoisting winch, a slow-speed winch mounted on the skip, is located within the Level I connecting drift. Air‑water pipelines, blasting lines, and signal and lighting cables for the shaft’s reverse excavation are all laid from Level I. Under normal conditions, once the shaft widening at Level II is completed, the rock from Level I will have already been removed and the shaft lining constructed. At that point, the hopper at Level I can be dismantled, and the temporary bottom pillar of that level can be excavated in reverse. Thereafter, Level II can commence centralized mucking and shaft lining construction. If, during the reverse excavation of the shafts at Levels I and II, the rock at Level I has not yet been fully removed, Level II should retain a 3–4 m thick temporary roof pillar, suspend further reverse excavation, and protect the Level I drifts until they are completely cleared of rock. After the hopper is removed, reverse excavation of the temporary roof and bottom pillars may then resume.
Bottom-up, multi‑section, parallel deepening operations can significantly accelerate shaft‑deepening progress and shorten the overall construction schedule; however, this approach also presents several challenges. Organizational coordination is complex, requiring precise synchronization of construction schedules and workflows across multiple sections to ensure seamless integration at every stage. Ventilation poses particular difficulties: with several sections operating simultaneously, the ventilation system must be carefully designed and managed to maintain underground air quality and safeguard workers. Moreover, high measurement accuracy is essential, as the construction of each section is interdependent; even minor measurement errors could lead to shaft deviation or poor alignment between sections, compromising the overall project quality.
2.2 Top-down Full-Section Deepening of the Shaft
2.2.1 Using auxiliary levels to extend the full cross-section of the shaft from top to bottom
When deepening a shaft from an existing auxiliary level, the construction equipment and methods are largely similar to those used for sinking a new shaft. To ensure uninterrupted mine production, an auxiliary level must be established below the existing working level; this is the key feature of this approach. The purpose of the auxiliary level is to excavate and construct various roadways and chambers required for the deepening operation and to install the necessary construction equipment. The excavated and lined roadways and chambers include auxiliary hoisting shafts—such as decline shafts or small vertical shafts connecting the production level to the auxiliary level—along with their headgear buildings, upper and lower staging areas, deepening‑shaft hoisting headframes, various winch chambers, ventilation drifts, material storage areas, and other chambers housing electromechanical equipment. Although these auxiliary facilities are temporary in nature, their scope is substantial; therefore, careful planning and rational layout are essential to minimize the volume of temporary roadway and chamber excavation. This is critical for achieving rapid, safe, and cost‑effective shaft deepening.
Its construction preparation and technological process are rather complex. Prior to commencement, it is necessary to excavate the down‑mountain drifts, roadways, and chambers to establish a deepening auxiliary level, thereby enabling the installation of various construction equipment and utility pipelines. Additionally, a section of the shaft must be back‑excavated upward from this auxiliary level to serve as the hoisting chamber for the deepening operation (the shaft headframe), while leaving behind protective rock pillars. If an artificial protection slab is employed, the shaft is back‑excavated until it connects with the water sump at the bottom, after which the artificial protection slab is constructed. Subsequently, another section of the shaft is sunk, the sealing plate, head sheave platform, and waste‑discharge platform are installed, and the shaft‑sinking hoisting equipment along with all necessary pipelines are commissioned. Once these preparatory tasks are completed, the shaft deepening can begin. Upon completion of the shaft excavation, lining, and equipment installation, the protective rock pillars or the artificial protection slab are removed, and finally, the masonry and ancillary installations for this section of the shaft are finalized.
This deepening method is widely employed in coal mines and exhibits strong adaptability. It can be applied in conditions where the surrounding rock is poorly stable or where significant gas hazards or water inflows are present. The deepening operation establishes its own independent system, minimizing disruption to normal mine production. The entire cross-section of the shaft can accommodate drilling equipment, and large-capacity skip buckets can be used to hoist waste rock, thereby accelerating the deepening process. However, this approach also has certain drawbacks: the volume of temporary roadway construction is substantial, which not only increases construction costs but also extends the project timeline; preparation for deepening requires a lengthy lead time, necessitating extensive advance planning and preparatory work; overall costs are high, encompassing expenses for temporary structures as well as the installation and dismantling of equipment; and multi-stage waste‑rock hoisting demands numerous pieces of machinery, complicating equipment management and maintenance.
2.2.2 Extending the shaft downward from the raise or ladderway, starting from the top
The characteristic of deepening a shaft from top to bottom by utilizing the existing extension chamber or ladderway is that these pre‑existing facilities are repurposed to house and suspend the equipment required for the extension work. This arrangement enables the shaft‑deepening operation to proceed independently and smoothly, without disrupting the mine’s normal production. Depending on the location of the hoisting machine and the矸石‑unloading platform used for the extension, this method can be classified into two types.
The first type features both the hoisting machine and the waste‑discharge platform located at ground level. This arrangement offers distinct advantages: both the hoisting of waste and the discharge of materials are carried out independently from the surface, centralizing management and facilitating unified scheduling and coordination; the volume of temporary underground workings is minimized, reducing construction complexity and minimizing disruption to production; and a single set of hoisting equipment can be used sequentially to advance several levels, thereby improving equipment utilization. However, this approach also has certain drawbacks. As the depth of development increases, the capacity of the bucket‑type hoist diminishes: with greater lifting heights, the cycle time lengthens, leading to a reduction in the amount of material hoisted per unit time and consequently slowing down the advancement rate—particularly in deep‑well development, where this effect becomes more pronounced. Moreover, the permanent surface headframe cannot be repurposed for development, necessitating the erection of an additional temporary headframe, which raises equipment costs and increases installation effort. The engineering is relatively complex; for instance, when using the ladder shaft for development, extensive modifications are required, involving dismantling, remodeling, and reconfiguring the ladder shaft to meet the demands of the advancing works. This method is suitable when the scope of modifications to the surface and shaft‑head production systems is limited, allowing for the placement of development‑related equipment and material storage without disrupting mine operations. However, the lifting height should not exceed 300–500 meters, as beyond this range, the decline in bucket‑hoist capacity would significantly impede progress.
The second type involves locating both the hoisting machine and the waste‑discharge platform at the underground production level. The advantages of this arrangement are a shorter hoisting height, reduced bucket‑hoisting time due to the shortened travel distance, and improved hoisting efficiency; moreover, the modification work required for the ladder shaft is minimal, thereby reducing construction complexity and costs. The drawbacks include a substantial volume of temporary underground excavation and support work, necessitating the development of additional tunnels and chambers to accommodate the hoisting equipment and waste‑discharge facilities; furthermore, the extension operation exhibits limited operational independence, with waste removal and material delivery being subject to the mine’s production schedule—during periods of high production activity, this may adversely affect the progress of the extension works. This configuration is suitable when the shaft extension depth exceeds 300–500 meters and there is insufficient surface space to install the necessary extension‑related equipment; under such conditions, placing the hoisting machine and waste‑discharge platform underground can address the lack of available surface area while leveraging the relatively short hoisting height to maintain efficient construction.
The hoist and the waste‑discharge platform are both located underground. The construction sequence for deepening the shaft is as follows: prior to deepening, various roadways and chambers serving the deepening operation are excavated at the production level; the deepening hoisting equipment is installed; the ladderway extending 7–20 meters above the production level is dismantled and converted into a bucket‑hoisting chamber, which includes a headframe and a sloping guard plate above the headframe for safety. Water accumulated in the bottom sump is drained, debris is removed, a temporary sump is constructed, and the deepening passage is excavated. Once the deepening passage is completed, excavation proceeds downward across the full cross‑section of the shaft by 6–8 meters, during which this section of the shaft lining is constructed. A steel beam is then installed at the base of the protective rock pillar, and a fixed platform is set up 4–6 meters below the beam to accommodate small hoisting equipment. At the production level, a sealing plate and a waste‑discharge platform are erected. Upon completion of these preparatory works, the deepening operation may commence; once the desired depth is reached, the rock pillar is removed.
Although extending the shaft through the extension chamber and the ladderway offers advantages such as reduced auxiliary work, shorter preparation time, and lower total construction costs, this approach is rarely employed in metal mines and is limited to a specific configuration utilizing the ladderway. The reason is that current shaft designs typically do not incorporate provision for an extension chamber, while the ladderway has a small cross‑section, accommodating only small skips with a capacity of less than 0.4 m³. Consequently, its hoisting capacity is limited, the rate of shaft extension is slow, and it fails to meet the demands of large‑scale, high‑efficiency mining operations in metal mines.
PART 03 Key Design Considerations for Shaft Extension Projects
3.1 Considerations of Engineering Geological Conditions
Engineering geological conditions are among the most critical factors in the design of shaft extension schemes, exerting a profound influence on construction complexity, safety, and project costs.
Rock hardness is an important geological parameter, directly influencing the selection of construction methods and equipment for shaft excavation. When the rock is particularly hard—such as granite or quartzite—conventional mechanical tunneling may be inefficient or even impractical, necessitating alternative approaches like blast‑driven excavation. Although blasting can fracture tough rock, it also entails certain risks; for instance, blast‑induced vibrations may damage surrounding rock masses and compromise shaft wall stability. Therefore, when employing blast‑driven excavation, it is essential to precisely calculate blasting parameters, carefully design the borehole pattern, and strictly control vibration levels. In addition, specialized blasting technicians should be assigned to ensure safe execution of blasting operations. Conversely, if the rock is relatively soft—such as shale or mudstone—while tunneling is easier, these rocks typically exhibit poor stability, making them prone to collapse, rib spalling, and other failures. Under such conditions, robust shaft lining support is required, with appropriate support systems and materials—such as shotcrete, rock bolts, and cable anchors—being deployed promptly to reinforce the shaft walls and prevent deformation or collapse.
The presence of faults and fracture zones further increases the complexity and risks associated with shaft extension. A fault is a planar discontinuity in rock mass, where relative displacement may occur between the two sides, leading to fragmentation of the rock structure and deterioration of its mechanical properties. When a shaft extends through a fault, it can encounter serious issues such as water inflow and collapse. For example, during shaft extension at one mine, a normal fault was encountered; due to the highly fractured rock within the fault zone and its high groundwater content, a sudden water‑inrush event occurred during excavation, with an instantaneous inflow rate reaching [X] cubic meters per hour, forcing construction to be halted. To address this problem, the contractor had to implement grouting‑based water‑stop measures, first reinforcing the fault zone by grouting to seal off the water‑inflow pathways, and then resuming excavation. This not only increased both costs and the project schedule but also posed significant safety risks to the workers. Similarly, fracture zones compromise the integrity of the rock mass, reducing its strength and making it highly susceptible to collapse during shaft construction. Therefore, when encountering faults or fracture zones, it is essential to develop detailed contingency plans in advance—such as adopting advanced support systems and grouting reinforcement—to ensure construction safety. Prior to excavation, techniques like advance drilling can be used to obtain precise information on the location, scale, orientation, and hydrogeological conditions of faults and fracture zones. Based on this data, appropriate advance support strategies can be designed, including pipe‑roof support and pre‑grouting with small‑diameter conduits, enabling timely wall support and reinforcement during the excavation process.
Selecting an appropriate shaft‑extension method based on geological conditions is of paramount importance. In areas with hard rock and stable ground, a scheme that involves reverse excavation of a small‑diameter raise from the bottom up, followed by enlarging the shaft, may be more suitable. This approach leverages the inherent stability of the rock: a small‑diameter raise is driven using the reverse‑shaft technique, after which the shaft is widened, thereby reducing mucking and hoisting operations and lowering construction costs. In contrast, in regions characterized by complex geological conditions, a full‑section extension of the shaft from the top down using auxiliary horizontal drifts may prove more reliable. By establishing auxiliary horizontal drifts, an independent construction system can be created, minimizing disruption to normal mine production while facilitating the management of challenges posed by adverse geology, such as water inflow and collapses. When choosing a method, it is also essential to comprehensively evaluate other project factors—such as construction schedule, cost, and equipment availability—and conduct a thorough techno‑economic analysis to identify the optimal solution.
3.2 Key Points for Controlling Measurement Accuracy
Measurement accuracy plays a pivotal role in shaft extension projects, serving as one of the key factors that ensure the quality and safety of the operation.
The verticality and cross-sectional dimensions of the shaft must strictly comply with design specifications, as these factors directly affect the shaft’s functional performance and safety. Deviations in shaft verticality can lead to unstable operation of hoisting equipment, increase wear and the risk of malfunctions, and even result in safety incidents. For example, excessive verticality deviations may cause the cage to collide with the shaft wall during hoisting, leading to severe consequences such as cage damage and casualties. Similarly, non‑compliant cross-sectional dimensions can give rise to a range of issues: undersized sections impair ventilation and transportation, while oversized sections drive up construction costs. Therefore, throughout the shaft extension process, effective measures must be implemented to ensure measurement accuracy.
Employing high-precision measuring instruments is fundamental to enhancing measurement accuracy. Advanced devices such as total stations and electronic levels boast high precision and efficiency, significantly improving the reliability of surveying results. Take the total station as an example: it can simultaneously measure angles and distances, and through meticulous measurements and calculations, it can accurately determine the location and orientation of shafts. When using a total station, it is essential to ensure that the instrument’s accuracy meets the required standards and to perform regular calibration and maintenance to maintain stable performance. Additionally, operators must strictly adhere to the instrument’s operating procedures to prevent measurement errors caused by improper use.
Taking the average of multiple measurements is also a common method for improving measurement accuracy. Since measurements are inevitably affected by various factors—such as instrument errors, human error, and environmental conditions—the result of a single measurement may contain some degree of uncertainty. By averaging multiple measurements, these errors can be reduced, thereby enhancing the reliability of the results. When conducting repeated measurements, it is important to maintain consistent measurement conditions and minimize extraneous sources of interference. For example, when measuring the verticality of a wellbore, one can perform multiple measurements at different times and under varying weather conditions, then statistically analyze the data and use the mean value as the final result.
In addition to the methods mentioned above, advanced measurement techniques and tools can also be employed, such as satellite positioning and laser surveying. Satellite positioning enables real-time acquisition of three-dimensional coordinates at measurement points, offering high accuracy and all‑weather operability, thereby providing a reliable coordinate datum for shaft extension surveys. Laser surveying, on the other hand, boasts rapid measurement speeds, high precision, and non‑contact operation, making it suitable for determining parameters such as shaft cross‑section dimensions and verticality. In practical applications, depending on the specific project requirements, multiple measurement techniques and methods can be integrated, mutually validating and complementing one another to ensure that the required measurement accuracy is achieved.
3.3 Safety Design and Assurance Measures
During the excavation of vertical shafts, numerous safety risks arise, which pose a serious threat to the lives of construction workers and the smooth progress of the project.
Collapse and roof fall are common yet hazardous safety risks. During the extension of vertical shafts, excavation-induced disturbances alter the stress state of the surrounding rock mass. If shaft lining is not installed promptly or if its strength is inadequate, collapse and roof-fall incidents can easily occur. For example, in a vertical shaft‑extension project at a certain metal mine, the contractor, in an effort to meet the schedule, proceeded with further excavation before the shaft lining had reached its design strength. This resulted in a sudden shaft wall collapse, burying several workers and inflicting substantial losses on the company. Consequently, reinforcing shaft lining is a critical measure for preventing collapse and roof-fall accidents. During construction, the choice of support methods and parameters should be carefully tailored to the geological conditions and construction techniques. For rock masses with good stability, simpler support systems such as shotcrete and rock bolts may suffice; for less stable formations, more robust support structures—such as rock anchors and steel supports—are required. At the same time, strict quality control of support installation is essential to ensure that the strength and stability of the support system meet the specified requirements.
Falling accidents also pose a major safety hazard during shaft‑extension construction. The shaft environment is complex, with numerous openings, edge areas, and other hazardous zones; inadequate safety measures can easily lead to falls. To prevent such incidents, comprehensive safety warning signs should be installed, with conspicuous signage posted at shaft entrances, openings, and edge areas to alert workers to potential risks. At the same time, reliable protective devices—such as guardrails and safety nets—must be in place to effectively isolate and safeguard hazardous zones. When performing work at height inside the shaft, personnel must wear fall‑protection harnesses and ensure that the harness’s anchor points are secure and stable.
Conducting safety education and training is a crucial means of enhancing construction workers’ safety awareness and operational skills. Through such training, workers gain an understanding of the safety risks and preventive measures associated with shaft‑extension operations, and they acquire the proper procedures and emergency‑response capabilities. Safety education and training should be conducted on a regular basis, covering topics such as safety regulations, safe operating procedures, and analysis of accident cases. In addition, newly hired employees must receive dedicated pre‑employment training to ensure they possess the requisite safety knowledge and skills before commencing work.
In addition, a comprehensive emergency response plan should be developed, outlining detailed measures and procedures for handling potential incidents such as collapses, roof falls, and falls. Regular emergency drills should be conducted to ensure that construction personnel are familiar with the contents of the emergency plan and the corresponding response protocols, thereby enhancing their emergency response capabilities and inter‑departmental coordination. In the event of an accident, this will enable swift and effective rescue operations, minimizing losses.
PART 04 Implementation Process for the Shaft Extension Plan
4.1 Meticulous Preparation Prior to Construction
Preparatory work prior to construction is the cornerstone of the successful implementation of the shaft‑extension project, and its importance is self‑evident. In terms of personnel organization, it is essential to assemble a highly professional, experienced construction team with clearly defined roles and responsibilities. The team should include a project manager, a technical lead, safety managers, and operational workers, each assuming distinct duties. As the project’s central leader, the project manager is responsible for overall coordination of schedule, quality, and safety, as well as for mobilizing and allocating resources to ensure that the project progresses according to plan. The technical lead, drawing on deep expertise, provides technical support, resolves complex technical challenges during construction, reviews construction plans and technical measures, and ensures their scientific soundness and reasonableness. Safety managers are tasked with formulating and enforcing safety management systems, conducting on‑site safety supervision and inspections, promptly identifying and eliminating potential hazards, and safeguarding the lives and well‑being of all workers. Construction personnel must strictly adhere to operating procedures to ensure both quality and timely completion. To familiarize workers with the project’s technical requirements and safety precautions, comprehensive and thorough technical briefings and safety training are indispensable. These briefings should detail the construction methods, technical parameters, and quality standards for the shaft extension, enabling workers to fully grasp the key technical points and critical stages of the process. Safety training, meanwhile, should cover relevant safety regulations, operating procedures, and analyses of past accident cases, thereby strengthening workers’ safety awareness and enhancing their ability to protect themselves.
Equipment allocation is another critical component of pre-construction preparations. Based on the shaft‑extension plan and construction‑process requirements, construction equipment must be selected and allocated appropriately. Hoisting equipment is one of the key systems in shaft‑extension operations; its lifting capacity and safety directly affect both project progress and worker safety. When choosing hoisting equipment, consider factors such as shaft depth, diameter, and the weight of materials to be lifted, and comprehensively evaluate parameters like lifting speed, lift height, and load‑carrying capacity to ensure the equipment meets operational needs. At the same time, rigorous inspection and commissioning are essential to verify reliable performance and the full functionality of all safety‑protection devices. Ventilation equipment is equally indispensable, providing fresh air to underground workers while exhausting harmful gases, thereby safeguarding their health and safety. Select ventilation systems by calculating the required airflow based on the shaft’s ventilation needs, and choose appropriate fans and ductwork to ensure the system operates properly. In addition, other construction equipment—such as rock‑drilling rigs, mucking machines, and support‑installation tools—should be provided to ensure that both quantity and performance align with project specifications. During equipment allocation, pay close attention to compatibility and integration among different units to prevent mismatches or incompatibilities.
Safety technical briefing is an essential component of pre-construction preparations. It conveys the project’s safety risks and preventive measures to every worker, thereby enhancing their safety awareness and risk‑mitigation capabilities. A safety technical briefing should cover such elements as a safety risk analysis, standard operating procedures, and emergency response protocols. During the briefing, use clear, easy‑to‑understand language and visual aids to ensure that workers fully grasp the information. In addition, require workers to sign to confirm receipt, thus ensuring that the briefing is effectively implemented.
4.2 Strict Control of the Construction Process
The construction phase is the core stage of the shaft extension project, requiring rigorous control at every step to ensure both quality and safety.
For the approach of reverse excavation from the bottom up in a small cross-section, followed by enlarging the shaft, reverse‑shaft sinking is the critical initial step. During this process, the excavation method should be selected appropriately based on geological conditions and project requirements. The suspended cage method is a commonly used technique; it employs a suspended cage as a working platform, with a winch lifting the cage to enable operators to carry out drilling, blasting, and other tasks inside the shaft. When using the suspended cage method, it is essential to ensure that the lifting system is safe and reliable to prevent cage‑fall accidents. The climbing cage method is another prevalent approach for reverse‑shaft excavation. It relies on a climbing cage that moves autonomously within the shaft to perform excavation. This method is particularly suitable for complex geological conditions, enhancing both efficiency and safety. Deep‑hole blasting involves drilling deep holes within the shaft and then detonating explosives to create the reverse shaft. This technique is well suited to hard rock formations, but requires precise control of blasting parameters to guarantee effective results and safety. Throughout the excavation process, strict attention must be paid to maintaining the verticality of the reverse shaft and controlling its cross‑sectional dimensions, ensuring that the final quality meets the required standards. Advanced surveying instruments and technologies can be employed to monitor the excavation in real time, allowing for timely adjustments to the excavation parameters.
Wellbore enlargement is a critical component of this scheme, and careful attention must be paid to the direction and method of the operation. When enlarging from bottom to top, it is essential to properly control the amount of rock retained and removed, thereby ensuring both worker safety and construction progress. During the enlargement process, close monitoring and maintenance of the wellbore walls are required to prevent collapse. Conversely, when enlarging from top to bottom, temporary support and robust safety measures must be implemented to prevent personnel and tools from falling into the counter‑shaft. Throughout the operation, construction must strictly adhere to the design specifications, ensuring that the wellbore’s cross-sectional dimensions and geometry meet the prescribed standards.
The removal of protective rock pillars is a high-risk operation that requires the development of a detailed demolition plan and comprehensive safety measures. Prior to commencement, a thorough analysis and assessment of the pillar’s structural integrity and stress conditions must be conducted to determine the sequence and methods of dismantling. When employing conventional methods, the pillar is typically excavated from top to bottom using existing extension tunnels, or by first drilling boreholes or constructing small‑section reverse shafts from below to connect with the main shaft, followed by upward excavation along the designed shaft cross‑section. For deep‑hole blasting, drill holes are first drilled into the pillar to ascertain its actual thickness, drain any water accumulated at the base of the shaft, and then excavate a small‑section adit within the pillar to create a blast‑compensation space. Subsequently, deep holes are drilled from the bottom up across the full shaft cross‑section; after blasting, the resulting muck is loaded onto auxiliary extension levels and transported out. Throughout the process, ventilation and drainage within the shaft must be closely monitored to ensure a safe working environment. In addition, dedicated personnel should be assigned to oversee safety; upon detection of any abnormalities, demolition operations must be immediately halted, and appropriate corrective measures implemented.
For the scheme of full-face deepening of the shaft from the top down, when using an auxiliary level to carry out this operation, it is essential to ensure that the layout of tunnels and chambers at the auxiliary level is rational and that all construction equipment is securely installed. During construction at the auxiliary level, excavation and support must be carried out strictly in accordance with the design specifications to guarantee the stability of the tunnels and chambers. Installation of construction equipment must comply with relevant standards and regulations to ensure its proper functioning. Throughout the shaft‑deepening process, measurement management should be strengthened to ensure that the shaft’s verticality and cross-sectional dimensions meet the design requirements. Measurement instruments should be regularly calibrated and maintained to enhance measurement accuracy. At the same time, reinforcement and monitoring of the shaft lining must be intensified; based on geological conditions and construction progress, appropriate support methods and parameters should be selected to ensure the safety and stability of the shaft wall.
When deepening a shaft from top to bottom using a decline or ladderway, careful attention must be paid to the layout of the hoisting equipment and the矸石‑unloading platform, as well as to the modification of the ladderway. The arrangement of the hoisting system and the unloading platform should be rational, facilitating both construction operations and management. Modifications to the ladderway must comply with safety requirements to ensure the safe ascent and descent of workers. During the deepening process, rigorous inspection and maintenance of hoisting equipment are essential; regular servicing and repairs should be carried out to guarantee reliable performance. At the same time, comprehensive safety education and training for construction personnel are required to enhance their safety awareness and operational skills, thereby preventing accidents.
Throughout the entire construction process, quality control and safety management are of paramount importance. It is essential to establish and refine a robust quality‑control system, strengthening quality inspections and acceptance procedures at every stage of construction. Each work procedure must undergo rigorous quality verification to ensure compliance with specified standards. Raw materials and prefabricated components should be subject to stringent inspection and testing to confirm their conformity to quality requirements. At the same time, investment in safety management must be increased, with comprehensive safety management systems and measures put in place. Safety warning signs should be installed to remind workers of potential hazards, and on‑site safety inspections and oversight should be intensified to promptly identify and eliminate safety risks. Any violations must be addressed with strict disciplinary action to safeguard the safety of the construction process.
4.3 Thorough Post-Construction Inspection
Post-construction acceptance is the final safeguard for ensuring the quality and safety of shaft extension projects, making it of paramount importance. Rigorous inspection enables the timely identification of issues and defects, allowing for corrective measures to be implemented and ensuring that the shaft can be put into service safely and reliably.
Inspection of the shaft’s strength, stability, and durability constitutes the core of the acceptance process. With regard to strength, concrete and steel grades must be tested to ensure compliance with design specifications. Concrete strength can be accurately assessed using methods such as the rebound hammer test or core sampling. For steel, verify material certificates and mechanical property test reports to confirm that the steel meets quality standards. In terms of stability, evaluate the structural integrity of the shaft, checking for deformation, cracking, or other defects. This can be done by measuring verticality and levelness, as well as conducting nondestructive testing, to assess the shaft’s structural stability. As for durability, consider the shaft’s resistance to corrosion, weathering, and other long-term environmental factors. Inspect the condition of the anti-corrosion coating and confirm that effective waterproofing and moisture‑proofing measures have been implemented to ensure the shaft’s longevity.
The criteria and methods for acceptance shall be strictly in accordance with the relevant codes and standards. In China, standards such as the Code for Construction and Acceptance of Mine Shafts and Tunnels set forth clear provisions for the acceptance of shaft extension projects. During acceptance, all relevant parameters of the shaft must be inspected and evaluated one by one in compliance with these standards. For example, with respect to the verticality of the shaft, the code stipulates that the deviation must not exceed a specified limit; high‑precision measuring instruments shall be used during inspection to ensure that the verticality meets the required specifications. As for the concrete strength of the shaft, acceptance shall be conducted according to the design strength grade, verifying that the compressive strength of the concrete test cubes satisfies the design requirements.
In addition to inspecting the physical quality of the wellbore, it is also necessary to review the project documentation. Project documentation serves as a record of the construction process and includes construction drawings, daily construction logs, material inspection reports, and acceptance records, among others. Reviewing this documentation enables an understanding of the construction sequence and quality‑control measures, allowing assessment of whether the work was carried out in accordance with applicable codes and design specifications. For example, by examining the construction log, one can determine whether any irregularities occurred during construction and what corrective actions were taken. Similarly, reviewing material inspection reports provides insight into the quality of raw materials and components, ensuring they meet the required standards.
During the acceptance process, a team of qualified professionals must be convened to carry out the inspection. These inspectors should possess extensive technical expertise and practical experience, and be thoroughly familiar with the relevant acceptance criteria and methodologies. They are expected to exercise due diligence and rigorously follow established procedures and standards to ensure the accuracy and reliability of the results. Any issues identified during acceptance must be promptly documented in a corrective action notice, requiring the contractor to address them within a specified timeframe. Upon completion of the rectification, a follow-up review shall be conducted to confirm that all problems have been fully resolved. Only through meticulous and stringent acceptance can we ensure that the shaft extension project complies with design specifications, thereby providing a reliable foundation for safe operations at the mine.
PART 05 Summary
The selection of a shaft‑extension scheme is a complex and critical decision‑making process that encompasses engineering‑geological conditions, measurement‑accuracy control, safety design, and safeguarding measures. Moreover, throughout the implementation phase, pre‑construction preparations, on‑site process management, and post‑construction acceptance are all of paramount importance.
The “bottom-up, small‑section reverse excavation followed by shaft widening” method, when rock conditions are favorable, offers advantages such as simplified mucking and hoisting, no need for dewatering, relatively rapid raise advancement, and low costs. In particular, the use of a reverse shaft to advance from top to bottom—leveraging pilot shafts and employing judicious reverse‑shaft excavation, shaft widening, and controlled removal of protective rock pillars—has been widely adopted in metal mines. By contrast, the “bottom-up, multi‑level raise advancement” approach, which combines underground pilot‑shaft development with parallel driving of inter‑level drifts and simultaneous reverse excavation of multiple levels, can accelerate shaft‑raise progress; however, it entails complex operational organization and places stringent demands on ventilation and surveying.
The top-down full-face shaft deepening scheme, which leverages auxiliary horizontal drifts to extend the shaft from the top down, offers strong adaptability and minimal disruption to mine production, while also accelerating the deepening process. However, it suffers from drawbacks such as substantial temporary roadway construction, lengthy preparation periods, and high costs. In contrast, deepening the shaft from the top down via a temporary or ladder adit entails fewer auxiliary works and shorter preparatory timelines; yet, the limited cross-sectional area of the ladder adit results in reduced hoisting capacity, thereby limiting its applicability in metal mines.